A steel column splice connection is located four feet above the top of the slab, typically unless noted otherwise. Upper and lower column segments join along their centerline using demand-critical complete-joint-penetration welds at both the flanges and the web. A web erection plate with filler plates and erection bolts secures the alignment prior to welding. A callout directs attention to weld access holes detailed on a separate sheet.
4'-0'' TYP. U.N.O. TO TOP OF SLAB A A CL OF COLUMNS 1 2 1/2 WEB ERECTION PL w/ FILLER PL AND ERECTION BOLTS AS REQUIRED DEMAND CRITICAL C.J.P. AT WEB DEMAND CRITICAL C.J.P. AT FLANGES NOTE: REF. 10/S334 FOR WELD ACCESS HOLES.