A double horizontal beam assembly interfaces with panels sized per plan, maintaining a three-eighths inch gap. Fire protection at the beam and column interface is provided per architectural specifications with designated top, bottom, and side clearances.
FIRE PROTECTION AT BEAM/COL (2H) - DOUBLE HORIZONTAL CL BEAM T/PANEL PER PLAN PANEL PER PLAN FIRE PROTECTION AT BEAM/COL INTERFACE PER ARCH e side e bott e top 3/8" T/PANEL PER PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership