Demolition of the existing mat slab and subsequent excavation as required for new construction at the basement level elevation of negative zero feet five inches.
245 BASEMENT -0'-5" PARKING DEMO (E) 45 BEALE MAT SLAB & EXCAVATE AS REQD FOR NEW CONSTRUCTION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership