A concrete slab poured over a fluted metal deck bears directly on the top flange of a wide flange steel beam. Headed shear studs weld through the metal deck into the top flange of the beam to provide composite action. A deck closure plate is positioned at the high flutes, with deck reinforcement placed in the concrete topping according to the structural schedule.
CONCRETE OVER METAL DECK REF. PLAN WF BEAM REF. PLAN HEADED SHEAR STUD FLUTED PROFILE DECK CLOSURE PL AT HIGH FLUTES MIN. 2" 1" DECK RIENF. REF. SCHEDULE