Two number five reinforcing bars are placed with one inch of clearance from the top of the slab typically, featuring a hook at the slab edge where it occurs. The structural steel column is aligned with intersecting grid lines, flanked by beams sized per plan. The steel deck is omitted from the drawing for clarity. Additional slab reinforcement extends two feet six inches typically from the column centerline.
NOTE: STEEL DECK NOT SHOWN FOR CLARITY BEAM SEE PLAN (2)#5 (1" CLR FROM TOP OF SLAB TYP)HOOK AT SLAB EDGE (WHERE OCCURS) EDGE OF SLAB AT EXTERIOR COLUMN WHERE OCCURS 2'-6" TYP PLAN GRID GRID
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership