A steel beam connects to a vertical steel column using bolted framing connections at a grid intersection. The composite steel deck and concrete topping maintain a one-inch clearance gap at the exterior wall assembly. The studs are laterally braced at the drift track with a specified lap length. Adjacent conditions and architectural interfaces are coordinated per architectural drawings.
STUDS LATERALLY BRACED AT DRIFT TRACK. POSSIBLE LOAD PATH SEE ADJACENT DETAIL FOR INFORMATION NOT NOTED GRID LAP LENGTH 1" CLR SEE ARCH SEE ARCH GAP 1" ± STEEL BEAM AND CONNECTION (WHERE OCCURS) AT SIM CONDITION, BEAM TO COLUMN CONNECTION OCCURS