The construction joint is positioned within the middle one-third of the span, featuring a roughened and cleaned interface between the first and second pours. Top and bottom reinforcing bars run continuously through the joint. A half-inch deep saw cut for sealant is located at the top surface, complemented by a half-inch chamfer at the bottom edge.
TOP AND BOTTOM REINFORCEMENT CONTINUOUS 1st POUR 2nd POUR CONSTRUCTION JOINT TO BE MADE IN MIDDLE 1/3 OF SPAN ROUGHEN AND CLEAN BEFORE MAKING 2ND POUR (SEE SPECIFICATIONS) 1/2" CHAMFER 1/2" DEEP SAW CUT FOR SEALANT PER PLAN THICKNESS T/SLAB EL SEE PLAN 6" MIN 3D OR D EFFECTIVE OPENINGS,