A reinforced concrete foundation wall bears on a continuous concrete footing with vertical reinforcing bars detailed with 90-degree hooks. A concrete slab connects to the foundation wall and must be in place seven days prior to backfill. The exterior face of the foundation wall receives waterproofing per architectural specifications and a drain board installed by others. A four-inch perforated pipe drain routes water to an outlet by others near the base of the wall.
6 TYP. DUCT THROUGH FDN. Drain Board by Others Waterproof Wall per Arch. 4" Perforated Pipe Drain to Outlet by Others Reinf. per RB w/ 90° Hook as Shown Slab Must be in Place 7 days prior to Backfill PL Where Occurs For Information Shown But Not Noted See Detail 4/S-3.2
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.