Two 250x150 steel tube sections connect to a vertical steel column with a twelve millimeter gap between the tubes. L100x100 structural angles secure the tube assembly with two bolts spaced at seventy-five millimeters. A vertical clearance of forty millimeters is maintained at the angle connection. The steel column is sized per schedule and referenced to elevations.
BETWEEN TUBES 12mm GAP STEEL COLUMN RE: SCHEDULE L100x100 250x150 TUBE RE: ELEVATIONS 75 75 40 002 002 002 003 003 003
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership