Text on the drawing
E E * * GUIDERAIL TUBE PER SCHEDULE GUIDERAIL SUPPORTS ABOVE (WHERE OCCURS) (2)-3/4"Ø A307 MB IN VERT LONG SLOTTED HOLES IN ANGLE FINGER TIGHTEN NUTS & SPOIL THREADS L6x3x3/8x0'-5" (LLV) EACH SIDE PL 3/4 CL OF GUIDERAIL & PL W BEAM PER PLAN CONN SIMILAR TO BELOW TYP 1/2" TYP 4" MAX 3/4" 5/16 1/4 1/4 5 GUIDERAIL TUBE PER SCHEDULE HSS14x6x3/8 TYP VERIFY LOCATION WITH ELEVATOR MANUFACTURER 2" E E * * GUIDERAIL TUBE PER SCHEDULE GUIDERAIL SUPPORTS ABOVE (WHERE OCCURS) (2)-3/4"Ø A307 MB IN VERT LONG SLOTTED HOLES IN ANGLE FINGER TIGHTEN NUTS & SPOIL THREADS L6x3x3/8x0'-5" (LLV) EACH SIDE PL 3/4 CL OF GUIDERAIL & PL W BEAM PER PLAN CONN SIMILAR TO BELOW TYP 1/2" TYP 4" MAX 3/4" 5/16 1/4 1/4 5 GUIDERAIL TUBE PER SCHEDULE HSS14x6x3/8 TYP VERIFY LOCATION WITH ELEVATOR MANUFACTURER 2"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe