A reinforced concrete slab meets a foundation wall with a pour joint specified as formed and poured after sixty days. Number four dowels featuring standard hooks are spaced on center at one and one-half inch clearance. Two continuous number four bars run horizontally within the assembly. A number four U-bar matches the vertical spacing with a specified lap length. A stud wall sits above the slab per plan, and reinforcement details reference sheet S5.16.
1 1/2" CLR #4 DOWEL @ __" O.C. w/ STD HOOK CONC FORMED & POURED AFTER 60 DAYS (2) #4 x CONT STUD WALL PER PLAN #4 U-BAR, MATCH VERT SPACING LENGTH LAP 1 1/2" CLR NOTE: SEE DETAIL x/xxx FOR INFORMATION NOT SHOWN PER DETAIL 3/S5.16