The base connection anchors an HSS8x4x3/8 post to a concrete metal deck using a base plate with post-installed anchors above a beam per plan. The header connection ties an HSS8x4x3/8 post to an HSS8x8x3/8 header with fillet welds. The top connection supports an HSS8x4x3/8 post below a concrete metal deck and beam using connection angles with slotted holes, through bolts, and a one-and-a-half-inch gap. The header kink details an angular transition in an HSS8x8x3/8 header joined with a complete joint penetration weld.
BASE PL W/ POST- INSTALLED ANCHORS HSS8X4X3/8 POST CONCRETE METAL DECK PER PLAN BEAM PER PLAN A BASE CONNECTION HSS8X8X3/8 HEADER HSS8X4X3/8 POST 1/7 1/4 1/4 1/4 B HEADER CONNECTION GAP 1 1/2" HSS8X4X3/8 POST ANGLES W/ SLOTTED HOLES THRU BOLT 1/4 1/4 BEAM PER PLAN CONCRETE METAL DECK PER PLAN C TOP CONNECTION HSS8X8X3/8 HEADER CJP D HEADER KINK