The ribbed metal deck requires crimping before applying a top seam weld at the side lap connection. Alternate button punch and proprietary side lap connections are omitted from this detail.
RIBBED DECK : CRIMP BEFORE WELDING TOP SEAM WELD C RIBBED DECK : CRIMP BEFORE WELDING NOTE: BUTTON PUNCH AND VERCO SIDE LAP CONN NOT SHOWN. CONN C 1/8"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership