Roof deck bears on pre-engineered roof joists with cross bridging installed at each end per the joist manufacturer. Bottom chord bridging is provided as specified, but is omitted at conflicts with mechanical ductwork from architectural and mechanical drawings. X-bridging by the joist manufacturer is placed on each side of the duct where a routing conflict occurs.
RF DECK PER PLAN PRE-ENGR RF JOIST PER PLAN MECH DUCT PER ARCH/MECH DWGS OMIT BOTTOM CHORD BRIDGING AT CONFLICTS W/ MECH DWGS BOTTOM CHORD BRIDGING PER JOIST MFR 'X' BRIDGING BY JOIST MFR EA SIDE OF DUCT AT CONFLICT CONFLICT AT JST BRIDGING/MECH DUCTWORK SEE FOR CALLOUTS IN COMMON 5 S5.01 CONN "X" BRIDGING EA END PER JOIST MFR