A steel column bears on a steel base plate set over 1 1/2 inches of non-shrink grout atop a concrete foundation and stem wall, secured with anchor bolts. The anchor bolts are surrounded by three sets of ties at 2 inches on center within a concrete pier. Continuous stem wall reinforcement runs through the assembly adjacent to an exterior slab-on-grade, with a concrete pour back sealing the slab interface. A concrete footing supports the assembly below the minimum frost depth with 3 inches of minimum cover.
CONC STEM WALL EXT SLAB OR GRADE STL COL STL BASE PL OVER 1 1/2” NON-SHRINK GROUT CONC SOG CONC POUR BACK AB'S RUN STEM WALL REINF CONT COVER 3" MIN FROST DEPTH MIN S502 12 TYP CONC POUR BACK (3) SETS OF TIES AT 2"oc AROUND AB CONC PIER CONC FTG CONC SOG STL COL COVER 3" MIN