An existing concrete-encased steel beam supports an existing concrete slab on one side and a concrete slab on steel deck on the other side. Level 2 is established at elevation 33'-0". Gridlines V and 15.A intersect at the structural framing assembly.
215 LEVEL 2 33'-0" V 15.A CONC SLAB ON STL DECK (E) CONC SLAB (E) CONC ENCASED STL BM
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership