A continuous waterstop runs the full length of the concrete slab joint. The top of slab elevation matches an overlay component, maintaining a minimum four-inch dimension from the waterstop placement to the bottom of the structural slab. The joint connects adjacent concrete pours while maintaining moisture barrier continuity across the transition.
of Slab Bottom M i n 4 " Slab Top of Top of Overlay Slab Top of of Slab Bottom Length of the Slab Waterstop Through the
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership