This concrete wall construction joint detail establishes the interface between a first and second concrete pour. The joint features a roughened surface with a one-quarter-inch minimum amplitude and a continuous edge notch. A continuous two-by-four is embedded at the joint face and removed prior to the second pour. Form ties span across the joint, with formwork placed on both exposed faces. Continuous reinforcing steel continues through the joint.
SECOND POUR FIRST POUR 2x4 CONT (REMOVE BEFORE 2ND POUR) CONSTRUCTION JOINT, ROUGHEN (1/4" MIN AMPLITUDE) PROVIDE CONT EDGE NOTCH FORM TIE EXPOSED FACE FORMS NOTE: PROVIDE 2x4 CONT ON BOTH FACES WHEN BOTH FACES ARE EXPOSED. REMOVE 2x4 AND TIGHTEN FORM TIE BEFORE PLACING 2ND. POUR REINF CONT THRU JOINT (REBAR NOT SHOWN) 1/2" 3" MAX