Demolition of an existing post at a stair opening requires temporary shoring to be installed for the beams above as needed. The stair opening is subsequently filled in following removal of the post.
FILL-IN STAIR OPNG DEMOLISH POST; PROVIDE TEMPORARY SHORING TO BEAMS ABOVE AS REQD
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership