Brick veneer is anchored to the exterior stud wall using steel brackets and ties positioned per general structural notes. Horizontal bridging is located within twelve inches of the clip connection. The stud wall and brick veneer bear on a concrete foundation stem wall adjacent to a concrete slab, with slab connection details referenced separately.
BRICK VENEER AS OCCURS, SEE ARCH STEEL BRACKET AND TIE PER GSN HORIZONTAL BRIDGING TO BE LOCATED WITHIN 12" OF CLIP CONNECTION FOUNDATION STEM WALL CONCRETE SLAB, SEE PLAN FOR CONNECTION TO SLAB SEE DETAIL 6/S752
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership