Metal floor deck runs parallel to a supporting steel beam and is centered over the top flange. The high flute of the deck is cut and welded directly to the beam flange. An overlap of two inches minimum is maintained between adjacent deck sheets over the beam support.
CUT HIGH FLUTE OF DECK AND WELD TO BEAM OVERLAP 2" MIN. DECK PARALLEL (CENTERED) NOTE: FOR INFORMATION NOT SHOWN REF. DECK PARALLEL (CENTERED) DETAIL.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership