A construction joint is positioned at the flute of the metal deck below. The joint aligns with the profile of the underlying deck.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership