The existing guardrail post is cut off flush with the top of the existing concrete slab. Because the existing steel sleeve is oversized compared to the guardrail post, a core drill is utilized inside the existing sleeve to remove the remaining section of the post.
CUT OFF EXISTING GUARDRAIL POST FLUSH WITH TOP OF EXISTING SLAB. 1. OUTSIDE CORNER TYPICAL LOCATION INSIDE CORNER EXISTING OVERSIZED STEEL SLEEVE EXISTING SLAB 2. EXISTING SLEEVE IS OVERSIZED COMPARED TO GUARDRAIL POST, SO CORE DRILL INSIDE EXISTING SLEEVE TO REMOVE REMAINING SECTION OF POST.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership