Augercast piles are located where future excavation shoring wall conditions occur at the adjacent main basement, noted as not in contract. The section outlines the pile placement relative to the foundation wall and grid line alignment.
AUGERCAST PILE, WHERE OCCURS FUTURE EXCAVATION SHORING WALL AT ADJ 50 MAIN BSMT, NIC
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership