Existing concrete wall is demolished to the face of the existing pile cap. Existing slab on grade is demolished with excavation required for new construction. The assembly coordinates basement level construction at an elevation of zero feet five inches relative to the finished floor.
215 BASEMENT 0'-5" (E) PILE CAP DEMO (E) SOG & EXCAVATE AS REQD FOR NEW CONSTRUCTION DEMO (E) CONC WALL TO FACE OF (E) PILE CAP
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership