An existing steel beam supports an existing concrete slab at Level 1, positioned twelve feet above datum. The existing reinforcing steel is cut flush with the top of the existing slab and protected with an approved epoxy-based coating.
215 LEVEL 1 12'-0" (E) STL BM WITHIN SW (E) CONC SLAB CUT (E) REINFORCING STEEL FLUSH WITH TOP OF (E) SLAB AND PROTEXT WITH APPROVED EPOXY-BASED COATING
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership