Grid lines twenty-three, twenty-three point six, and twenty-four establish column spacing of seventeen feet and thirteen feet. A structural note specifies that concrete raised equipment pads for mechanical, electrical, and plumbing equipment are three and one-half inches thick unless noted otherwise. Locations and dimensions must be coordinated with mechanical, electrical, and plumbing trades and the general contractor.
24 23 17'-0" 13'-0" 23.6 5 NOTE: CONCRETE RAISED EQUIPMENT PADS FOR MEP EQUIPMENT NOT SHOWN FOR CLARITY - ALL PADS 3 1/2" THICK UNO - SEE 16/S-511 - COORDINATE LOCATIONS & DIMENSIONS W/ MEP & CONTRACTOR