This floor transition detail connects a sealed concrete floor finish to an electrostatic discharge floor tile system at a doorway center line. An aluminum transition profile, Schluter Reno-U AEU35 or similar, is installed at the transition point between the different floor finishes. The concrete slab and finish floor level accommodate the transition thickness to adjacent flooring.
ESD FLOOR TILE AS SCHEDULED FLR ELEV TRANSITION POINT BETWEEN FLOOR FINISHES CONCRETE SLAB / FINISH FLOOR LEVEL TO TRANSITITION TO CARPET MFR: SCHLUTER RENO-U AEU35 OR SIMILAR SEALED CONCRETE DOOR TYPE AS SCHED EQ EQ OF DOOR C L
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership