A metal deck runs parallel to a supporting wide-flange steel beam, featuring a closure strip provided by the deck manufacturer in the same gauge as the metal deck. Stud connectors anchor through the deck into the top flange of the beam. Dimensional callouts indicate clearance requirements of fifty millimeters minimum at a single row of studs and one hundred twenty-five millimeters minimum at a double row of studs, with an additional twenty-five millimeter dimension.
50 MIN AT SINGLE ROW OF STUDS, 125 MIN AT DOUBLE ROW OF STUDS DECK MFR TO PROVIDE CLOSURE STRIP AS REQ'D SAME GAUGE AS METAL DECK 25 MIN 91
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership