Shear studs must be positioned in the low flute of the metal deck closest to the nearest support. Layout begins at each end of the beam and works toward the center with a maximum spacing of sixteen inches. Studs are omitted where not required by design. The centerline of support marks the boundary for the layout.
16" MAX BEGIN STUD LAYOUT AT EA END & WORK TOWARD CNTR OF BEAM POSITION STUD IN LOW FLUTE CLOSEST TO NEAREST SUPPORT WHERE NO STUD IS REQ'D CL OF SUPPORT
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership