Utility trenches must be backfilled and compacted in accordance with the geotechnical report requirements. Excavation for pipe trenches is prohibited within the restricted boundary parallel to the footing. The 1'-6" clearance zone establishes the safe distance for utility placement relative to the structural foundation. Sloped excavation limits maintain structural soil support and prevent undermining of the footing.
NO DIGGING FOR PIPE TRENCH PARALLEL TO FOOTING WITHIN THIS BOUNDARY UTILTY TRENCHES BACK FILL & COMPACT PIER GEOTECHNICAL REPORT 2 1 1'-6"