Composite metal deck runs parallel to supporting UC or WC steel beams sized per plan, with Comfloor decking broken where two rows of shear studs are required. Nelson studs are installed per the structural schedule, maintaining a typical forty millimeter offset from the deck edge. The concrete slab bears directly on the profiled steel deck units welded to the underlying structural steel framing.
DECKING PARALLEL TO BEAM UC OR WC BEAM SECTION BREAK COMFLOOR WHERE 2 ROWS SHEAR STUDS ARE REQUIRED TYP 40mm FROM EDGE FOR TYPICAL INFO SEE DETAIL OPPOSITE NELSON STUDS PER SCHEDULE BELOW BEAM PER PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership