A steel beam connects to an existing structural steel column encased within an existing concrete pilaster using a bolted shear tab connection. The concrete slab on metal deck bears adjacent to the pilaster at Level 8, set at elevation 113'-3". The steel beam framing is detailed per the typical structural connection detail for existing steel structures.
215 LEVEL 8 113'-3" 7 (E) CONC PILASTER CONC SLAB ON STL DECK STL BM W/ CONN TO (E) STL COL PER "TYP STL BM CONN TO (E) STRUC" DET
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership