A beam framing connection at a wall includes a full-depth web stiffener and an opposite beam connection. The assembly features concrete over a metal floor deck bearing near a structural grid line with a one-inch clearance. A drift track condition at the solid wall is coordinated with architectural elements, maintaining a one-inch plus or minus gap. Additional conditions between beams and unnoted information are referenced to detail 4 on sheet S6.21, while solid wall drift track conditions reference detail 3 on sheet S6.21.
GRID SEE ARCH 1" ± GAP SEE ARCH 1" CLR SEE DET FOR INFO NOT NOTED AND FOR COND BTWN BEAMS CONC OVER MTL FLR DECK FOR DRIFT TRACK CONDITION AT SOLID WALL SEE DET CEILING SEE ARCH FULL DEPTH WED STIFF OPP BEAM CONNECTION / (4 S6.21) / (3 S6.21)
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership