The detail illustrates a concrete slab drop-down section forming a dock leveler pit supported by foundation walls. It incorporates rigid insulation and a waterproofing membrane along the underside of the haunch and slab, along with 10M reinforcing bars spaced at 300mm each way (EW) typically. A note directs the contractor to coordinate the dock leveler pit size and location with architectural and shop drawings.
MB-H TO SUIT DOCK LEVELER NOTE: CONTRACTOR TO COORDINATE DOCK LEVELER PIT SIZE AND LOCATION WITH ARCHITECTURAL AND SHOP DRAWINGS. INSUALTION SEE ARCH, TYP WATERPROOF MEMBRANE SEE ARCH, TYP 10M@300 EW TYP 1 1 TYP
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Sign in to subscribe