Metal deck bears on the top flange of a supporting steel beam requiring a two-inch minimum lap. Deck welding is executed per specification 10/SF6.11. When bearing is less than two inches, a ten-gauge continuous plate is introduced beneath the lapped metal deck.
IF LESS THAN 2" 2" MINIMUM SEE DETAIL AT RIGHT 10 GAGE CONT PLATE DECK WELDING PER [10/SF6.11] DECK WELDING PER [10/SF6.11] LAP 2" MIN LAP 2" MIN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership