The post-tensioned concrete slab features a thickened edge with a post-tension end anchor at the perimeter. Two tendons run along the edge of the slab minimum, accompanied by chord steel and top reinforcing bars bent as shown per plan. Vehicle barrier cables are coordinated per the architectural drawings.
(2) TENDONS ALONG EDGE OF SLAB (MIN) POST TENSION END ANCHOR, SEE 7/S-511 CHORD STEEL, SEE PLAN P-T CONCRETE SLAB, SEE PLAN TOP REINFORCING BAR, SEE PLAN, BEND AS SHOWN VEHICLE BARRIER CABLE, SEE ARCH THICKENED SLAB EDGE 36 2 1'-4" SEE PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership