A built-up hollow structural section post connects to an overhead beam and metal deck assembly, featuring a bottom flange brace framed into the column. The structural connection incorporates bolted connections and welded gusset plates as specified per plan, supporting the top-of-concrete elevation.
L C BOT. FLANGE BRACE BM. PER PLAN HSS T.O.C. PER PLAN NOTES: 1. SEE DETAIL FOR INFO. NOT NOTED. 2. DECK ORIENTATION VARIES. 8 1" = 1'-0" 12 BUILT-UP HSS POST
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership