A back-to-back tiedown post is anchored into a concrete wall footing and slab-on-grade. The assembly features a tiedown and PABX anchor rod embedded into a square concrete pad centered beneath the holddowns. Sheathing edge fastening is provided to each stud as specified in the tiedown schedule. The concrete slab edge occurs at the perimeter adjacent to the wall footing with a minimum one foot eight inch vertical dimension.
de=17" 1'-8" MIN. BACK-TO-BACK TIEDOWN POST W/ SHEATHING EDGE FASTENING TO EACH STUD - SEE TIEDOWN SCHEDULE TIEDOWN & 'PABX' ANCHOR ROD - SEE PLAN & TIEDOWN SCHEDULE SHEET S-0003 ANCHOR - CENTERED TO PAD CONC. SLAB - SEE PLAN WALL FTG - SEE & 1 S-155012 EDGE OF SLAB - WHERE OCCURS 2'-10" SQ. PAD CENTERED TO ALL HOLDOWNS, TYP., U.N.O. 2 S-155012