A concrete pier or column bears on a concrete footing, tied together with vertical dowels that match the vertical reinforcement above. Continuous footing reinforcement runs through the spot footing where it occurs. Horizontal wall and pier reinforcement continues through the pier or column assembly. A concrete slab on grade abuts the pier and column on a compacted subbase.
DOWEL TO MATCH VERT COLUMN REINF ABOVE CONCRETE FOOTING, SEE PLAN AND SCHED CONCRETE PIER, SEE PLAN AND SCHED RUN CONT FTG REINF CONT THROUGH SPOT FOOTING WHERE OCCURS RUN HORIZONTAL WALL REINFORCING CONT THROUGH PIER DOWEL TO MATCH VERT REINF ABOVE - TYP CONCRETE COLUMN, SEE PLAN AND SCHED CONCRETE WALL BEYOND, SEE PLAN AND SCHED RUN HORIZONTAL WALL/ PIER REINFORCING CONT THROUGH COLUMN CONCRETE SLAB ON GRADE, SEE PLAN CONCRETE SLAB ON GRADE, SEE PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership