Partial demolition of an existing reinforced concrete stair bearing on an existing mat foundation. The cut extents of the concrete stair with required shoring placed beneath the inclined slab. Concrete is chipped around the existing longitudinal rebar, specifically designated as number 6 reinforcing bars spaced at five inches on center verify in field, ensuring the existing steel remains completely undamaged.
SHORE OUTLINE OF DEMO EXTENTS OF (E) CONCRETE STAIR (E) MAT FOUNDATION CHIP AROUND (E) LONGITUDNAL REBAR. (E) LONGITUDNAL REBAR TO REMAIN UNDAMAGED (E) #6 @ 5" OC VIF 7R @ 7 1/4"= 4' 2 3/4"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership