A metal deck runs parallel to a wide-flange steel beam, with the deck cut as required for welding the bare deck directly to the beam or to accommodate the attachment of a shear stud. Concrete fill and shear studs are placed where indicated by the deck schedule. The assembly coordinates composite slab construction with parallel framing members.
SECTION CUT DECK AS REQUIRED FOR WELDING OF BARE DECK TO Wx BEAM OR TO ACCOMODATE ATTACHMENT OF SHEAR STUD SEE FOR BALANCE OF INFORMATION SHEAR STUD WHERE CONC FILL OCCURS CONCRETE WHERE OCCURS PER DECK SCHED ON
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership