A concrete slab over metal floor deck is supported by a steel beam, tied together with one-half-inch headed stud anchors spaced typically. A three-sixteenth-inch fillet weld with field weld and weld-around symbols connects the components at a three-inch by twelve-inch typical spacing. The centerline of the beam aligns with the stud placement, maintaining a half-inch offset.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership