An existing retaining wall foundation bears on a soldier pile per schedule, with elevation to be field verified. A bearing plate measuring one by twelve by the pile depth sits atop the pile. The gap between the bearing plate and the existing foundation is filled with high-strength non-shrink grout, maintaining a space of two to three inches. Four-inch treated hem-fir number two or better lagging spans between the underpinning piles with a four- to six-inch clearance.
EXISTING RETAINING WALL FOUNDATIONS (FIELD VERIFY ELEVATION) 2" TO 3" 4" TREATED HEM-FIR NO. 2 OR BETTER LAGGING BETWEEN UNDER PINNING PILES 4" TO 6" BEARING PLATE 1 X 12 X PILE DEPTH DRY PACK GAP WITH HIGH STRENGTH NON-SHRINK GROUT 5/16 SOLDIER PILE PER SCHEDULE