The construction joint is located parallel to the purlins within the middle one-third of the deck span between adjacent pours. Reinforcement continues uninterrupted through the construction joint. The joint detail shows the slab termination over the supporting metal deck with a designated one-and-one-half-inch offset.
PURLIN PURLIN PURLIN PURLIN GIRDER GIRDER REINF. SHALL CONTINUE THROUGH C.J. C.J. PARALLEL TO PURLIN LOCATED IN MIDDLE 1/3 OF DECK SPAN FIRST POUR SECOND POUR C.J. . . . 4'-0" 4'-0" TYP. . 4'-0" L L/3 L/3 L/3 . 1 1/2" . 1 1/2"