An HSS column per plan aligns along a center line with a column splice located per schedule. Both column ends require a mill finish for bearing. An erection plate is included as required per contractor. A double bevel weld is specified only where required, accompanied by a complete joint penetration weld with field weld symbols.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership