A structural shear wall hold-down bracket is secured to a compression post and end stud with through bolts per schedule. The hold down anchors down through a routed cross-laminated timber slab, utilizing a quarter-inch steel plate placed below the bottom of the timber slab. Nuts are provided at both the top and bottom of the bearing plate. The wall assembly includes a bottom track fastened to the floor slab with screws.
18" MAX. SHEAR WALL HOLD DOWN REF. SCHEDULE HOLD DOWN THRU BOLT REF. SCHEDULE 1/4" PL PLACED BELOW BOTTOM OF CLT ROUTE CLT FOR HOLDOWN PROVIDE NUT TOP AND BOTTOM OF PLATE CLT SLAB REF. PLAN SHEAR WALL BOTTOM TRACK REF. SCHEDULE SHEAR WALL COMPRESSION POST REF. SCHEDULE SHEAR WALL END STUD 1/2" MAX. TYP. 1/4" MIN. TYP. BOTTOM TRACK SCREWS REF. SCHEDULE 5.