A concrete slab on steel deck bears directly upon the top flange of a built-up wide flange beam. Continuous structural steel angles measuring 4x3x1/4 inches with long legs vertical are positioned on each side of the top flange. Shear studs are spaced along the top flange per structural plans. A clearance gap of three-quarters of an inch is maintained between the deck underside and the beam flange.
SLAB ON STL DECK BU WF BEAM TYP 3/4" TOP FLANGE > 3" TYP L4x3x1/4 LLV, TYP TOP FLANGE STUDS PER PLAN PER PLAN TOC NOTES: 1. SEE BUILT-UP WIDE FLANGE SCHEDULE AND DETAIL FOR MORE INFORMATION. 2. SEE TYPICAL STEEL DECK DETAILS.