A reinforced concrete slab-on-grade bears on a foundation pile cap with a defined pour break. The top of the main floor elevation is set at 100.00 with a fifty millimeter step. Slab reinforcement and development lengths are coordinated per structural plans and notes. Pile cap reinforcement is detailed separately on the structural drawings.
T.O MAIN FLOOR 100.00 50 POUR BREAK, SEE NOTE 4 FOR SLAB REINF SEE PLAN ld FOR PILE CAP REINF SEE PLAN & DETAILS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership