This foundation section details the transition between existing and new structural elements along grid G. An existing concrete mat slab and concrete shear wall interface with a new upturned pile cap, separated by a bond breaker. The upturned pile cap supports a structural steel column where indicated and bears on either timber piles or augercast piles depending on location.
245 BASEMENT -0'-5" G 45.G 45.H (E) CONC SW (E) 245 MARKET (E) CONC MAT SLAB (E) PILE CAP (E) TIMBER PILE WHERE OCCURS AUGERCAST PILE, WHERE OCCURS UPTURNED PILE CAP STL COL WHERE OCCURS BOND BREAKER BETWEEN (E) AND NEW FOUNDATIONS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership